Floor Plans 7

Rush Metropolis

By Rush Lanka Group | Dehiwala

Now SellingMove in 2028
Floor Plans 7
ApartmentsProperty type
2–3Beds
930–1,580SqFt
Now SellingListing status
2028Move-in year
125Total units
23Floors
7Floor plans

Overview

Rush Metropolis is a 23-storey luxury apartment tower at No. 05, Jayanthi Road, Dehiwala — described by the developer as the tallest and most ambitious residential project in the area. The tower has 125 apartments in 2 and 3-bedroom layouts across 7 unit types. Construction progress (per Rush Lanka Group's own tracker): site clearing (Apr 2024), groundbreaking (Jul 2024), piling (Aug 2024) and the foundation (Jun 2025) are complete; the…

Rush Metropolis is a 23-storey luxury apartment tower at No. 05, Jayanthi Road, Dehiwala — described by the developer as the tallest and most ambitious residential project in the area. The tower has 125 apartments in 2 and 3-bedroom layouts across 7 unit types. Construction progress (per Rush Lanka Group's own tracker): site clearing (Apr 2024), groundbreaking (Jul 2024), piling (Aug 2024) and the foundation (Jun 2025) are complete; the ground floor slab and floor construction (levels 1-3) are in progress. Unit types (per the developer's brochure): Unit A 3 bed / 1,312 sq ft, Unit B 2 bed / 988 sq ft, Unit C 2 bed / 998 sq ft, Unit D 3 bed / 1,430 sq ft, Unit E 3 bed / 1,581 sq ft, Unit F 2 bed / 932 sq ft, Unit G 3 bed / 1,484 sq ft. Floor-to-floor height 10.5 ft, three high-speed passenger elevators. Architect: Anushka Dassanayaka (AIA SL); structural engineer: Laksiri Cooray. Sales & marketing partner: Rush2Homes.

Property type: ApartmentsBeds: 2–3
Listing status: Now SellingSqFt: 930–1,580 SqFt
Move-in year: 2028Address: Dehiwala
Total units: 125Road: Jayanthi Road
Floors: 23District: Colombo
Floor plans: 7Developer: Rush Lanka Group
Property type: ApartmentsTotal units: 125
Listing status: Now SellingFloors: 23
Move-in year: 2028Address: Dehiwala
Beds: 2–3District: Colombo
SqFt: 930–1,580 SqFt

Pricing and fees

Contact us for current pricing and availability.

Key Features

Amenities

Floor Plans

Construction Updates

Ground Floor Slab (in progress)

Sep 9, 2026

Ground Floor Slab (in progress)

Floor Construction (Level 1, 2, 3...) (in progress)

Sep 9, 2026

Floor Construction (Level 1, 2, 3...) (in progress)

Foundation Completed

Jun 1, 2025

Foundation Completed

Piling

Aug 1, 2024

Piling

Groundbreaking

Jul 1, 2024

Groundbreaking

Site Clearing

Apr 1, 2024

Site Clearing